Email platform switching cost calculator
Compare your monthly quotes and migration budget. See modeled costs and when a lower monthly bill would cover the transition.
Includes your value of time and fixed monthly amounts. This is not a cash-flow forecast or completion schedule. Method and worked example.
How the cost comparison works
Choose the first complete month after migration as the comparison start. Both alternatives use that same start and the same number of months. Add only incremental transition costs caused by switching. Ordinary incumbent charges before the start, which both choices would incur, are excluded.
Extra destination charges during migration and unavoidable incumbent overlap charges belong in the overlap field once. Supply actual extra partial-month or prorated amounts; the worksheet does not infer billing dates. Put other incremental charges, such as a cancellation or agency fee, in the one-time-fee field. Avoid counting the same work as both an agency fee and valued time.
- Value of migration time
- Estimated work hours × value per hour, rounded once to the nearest cent; a half-cent rounds up.
- Modeled transition cost
- Value of time + other one-time fees + extra overlap charges.
- Staying for the comparison period
- Current monthly cost × complete months.
- Switching for the comparison period
- Modeled transition cost + destination monthly cost × complete months.
- First complete month covering transition cost
- When the monthly cost reduction is positive, divide modeled transition cost by that reduction and round up to a whole month. Exact division gives a tie at that month; the following month is first strictly cheaper.
The result separately shows entered cash charges and the modeled total including your valued time. Your time value may not be a cash payment. A lower modeled cost does not establish matching features, migration feasibility or a better business outcome.
Worked example: equal costs at month three
This hypothetical example uses monthly-billed amounts in USD. It is not a vendor quote or an estimate of how long a real migration takes.
| Assumption or calculation | Amount |
|---|---|
| Current / destination monthly cost | USD 100 / USD 60 |
| Value of time: 2 hours × USD 30/hour | USD 60 |
| One-time fees / extra overlap | USD 20 / USD 40 |
| Modeled transition cost: 60 + 20 + 40 | USD 120 |
| Staying for 3 months: 100 × 3 | USD 300 |
| Switching for 3 months: 120 + 60 × 3 | USD 300 |
The monthly reduction is USD 40. The modeled USD 120 transition cost is covered at month three, when the totals are equal. At month four, staying costs USD 400 and switching costs USD 360, including valued time. Cash charges alone for switching over three months are USD 240; the other USD 60 is the entered value of time.
What to resolve outside the worksheet
Match contacts, send volume, features, tax and add-on basis before entering quotes. Every amount uses one selected currency; changing the selector relabels the amounts and does not convert them. USD, CAD, GBP, EUR and AUD use two decimal places here.
The scenario holds monthly amounts constant. It does not model annual-prepayment cash flow, future price changes, net refunds or credits requiring negative transition costs, or costs you have not entered. It is not a dated cash-flow forecast.
Work hours are your estimate, not a completion schedule. Check export coverage, subscription states, workflow dependencies, authentication and cutover tests with the providers involved. Neither the calculation nor the planning checkmarks validate a migration, predict inbox placement or certify that data will transfer without loss.