S
SaaSScored

Email platform switching cost calculator

Compare your monthly quotes and migration budget. See modeled costs and when a lower monthly bill would cover the transition.

Includes your value of time and fixed monthly amounts. This is not a cash-flow forecast or completion schedule. Method and worked example.

Your cost assumptions

Your cost assumptions

No conversion. Monthly billing amounts only; annual-prepayment cash flow is excluded.

Use the monthly amount for the plan, sends and add-ons you need.

Match contacts, sends, features, tax and add-on basis to the current plan.

Transition budget

Enter incremental costs caused by switching, including an explicit 0 where appropriate. Blank fields are not free. Put agency or cancellation charges in fees; do not also count that same work as valued time.

Your estimate from the work you have inventoried; enter 0 if none.

Use 0 to exclude the value of time. This is not an agency quote.

Exclude work already counted above. Enter 0 if none.

Only charges caused by switching. Exclude ordinary current-platform charges that both choices would incur; count each extra charge once.

1–120 months, starting with the first complete month after migration.

How the cost comparison works

Choose the first complete month after migration as the comparison start. Both alternatives use that same start and the same number of months. Add only incremental transition costs caused by switching. Ordinary incumbent charges before the start, which both choices would incur, are excluded.

Extra destination charges during migration and unavoidable incumbent overlap charges belong in the overlap field once. Supply actual extra partial-month or prorated amounts; the worksheet does not infer billing dates. Put other incremental charges, such as a cancellation or agency fee, in the one-time-fee field. Avoid counting the same work as both an agency fee and valued time.

Value of migration time
Estimated work hours × value per hour, rounded once to the nearest cent; a half-cent rounds up.
Modeled transition cost
Value of time + other one-time fees + extra overlap charges.
Staying for the comparison period
Current monthly cost × complete months.
Switching for the comparison period
Modeled transition cost + destination monthly cost × complete months.
First complete month covering transition cost
When the monthly cost reduction is positive, divide modeled transition cost by that reduction and round up to a whole month. Exact division gives a tie at that month; the following month is first strictly cheaper.

The result separately shows entered cash charges and the modeled total including your valued time. Your time value may not be a cash payment. A lower modeled cost does not establish matching features, migration feasibility or a better business outcome.

Worked example: equal costs at month three

This hypothetical example uses monthly-billed amounts in USD. It is not a vendor quote or an estimate of how long a real migration takes.

Hypothetical switching cost example in US dollars
Assumption or calculationAmount
Current / destination monthly costUSD 100 / USD 60
Value of time: 2 hours × USD 30/hourUSD 60
One-time fees / extra overlapUSD 20 / USD 40
Modeled transition cost: 60 + 20 + 40USD 120
Staying for 3 months: 100 × 3USD 300
Switching for 3 months: 120 + 60 × 3USD 300

The monthly reduction is USD 40. The modeled USD 120 transition cost is covered at month three, when the totals are equal. At month four, staying costs USD 400 and switching costs USD 360, including valued time. Cash charges alone for switching over three months are USD 240; the other USD 60 is the entered value of time.

What to resolve outside the worksheet

Match contacts, send volume, features, tax and add-on basis before entering quotes. Every amount uses one selected currency; changing the selector relabels the amounts and does not convert them. USD, CAD, GBP, EUR and AUD use two decimal places here.

The scenario holds monthly amounts constant. It does not model annual-prepayment cash flow, future price changes, net refunds or credits requiring negative transition costs, or costs you have not entered. It is not a dated cash-flow forecast.

Work hours are your estimate, not a completion schedule. Check export coverage, subscription states, workflow dependencies, authentication and cutover tests with the providers involved. Neither the calculation nor the planning checkmarks validate a migration, predict inbox placement or certify that data will transfer without loss.